Awarded contract
Published
Summer Works 2016/2017 - Mount Seskin Community College - Roof Works
13 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Current supplier
Callan Contracts
Description
Note: This outline description is a general outline and should be read in conjunction with the Architect’s Scope of Work descripted on the Architect’s Drawings. Areas 1 and 2A Note: Previous upgrade works have occurred in these areas. DDLETB have outlined that a full upgrade is therefore not required. Following opening up works, contractor is to report on existing condition of primary roof structure, insulation, felt batten system, rain water goods, fascia and soffit and flashings to all of the above. and Architect to inspect and approved. 1. REMOVE EXISTING TILES INCLUDING ALL RIDGE TILES. 2. REMOVE ANY DEFECTIVE BATTENS 3. STRIP BACK AND REMOVE EXISTING ROOF MEMBRANE AND ALL ASSOCIATED FLASHING AND INSULATION ON ALL FLAT ROOF AREAS, EXPOSING THE EXISTING DECK. 4. EXISTING ROOFLIGHTS TO BE DISENSEMBLED AND STORED FOR REUSE. FLASHINGS TO BE SALVAGED AND REUSED WHERE NECESSARY. NOTE: ALL MATERIALS TO BE SORTED AND TO BE DISPOSED OFFSITE. Areas 2 and 3 1. REMOVE EXISTING TILES INCLUDING ALL RIDGE TILES 2. REMOVE ALL TIMBER BATTENS AND FIXINGS 3. REMOVE EXISTING FELT UNDERLAY 4. ROOF TIMBERS TO BE INSPECTED BY TIMBER SPECIALIST TO REPORT ON STRUCTURAL INTEGRITY. 5. REMOVE ALL FLAT BED VALLEY GUTTERS, FLASHINGS AND INSULATION. 6. REMOVE EXISTING FASCIA, SOFFIT AND ALL RAIN WATER GOODS. 7. REMOVE ALL ROOFLIGHTS AND LANTERN ROOF LIGHTS AND ASSOCIATED FLASHING AND FIXINGS. NOTE: ALL MATERIALS TO BE SORTED AND TO BE DISPOSED OFFSITE. 7. Works Schedule Summary Areas 1 and 2A 1. INSTALL NEW CONCRETE INTERLOCKING ROOF SYSTEM AND RIDGE TILES IN ACCORDANCE WITH SPECIFICATION. NOTE: CONTRACTOR TO INCLUDE FOR ALL FIXINGS AND FIXTURES AND NEW CONTOUR INLINE VENTS. AMOUNT ON PLAN IS INDICATIVE. ROOF SPECIALIST TO ADVISE ON AMOUNT REQUIRED BASED ON CALCULATION. 2. REPLACE ANY BATTENS WITH NEW TREATED TIMBER BATTENS IN ACCORDANCE WITH SPECIFICATION. INCLUDING ALL FIXINGS. CONTRACTOR TO ALLOW FOR 10% REPLACEMENT. 3. REPAIR AND RESEAL WITH APPROVED TAPE ANY DEFECTIVE VAPOUR PERMEABLE UN
Personalised AI Summary
Unlock decision maker contacts.
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Scoil Iosagain Infant National School (Mallow)
90,000
Published 3 months ago
Kildare and Wicklow Education and Training Board
83,000
Published 6 months ago
Kildare and Wicklow Education and Training Board
68,000
Published 7 months ago
Kilkenny and Carlow ETB
890,000
Published 8 months ago
Kildare and Wicklow Education and Training Board
14,000
Published 9 months ago
Cavan and Monaghan Education & Training Board
130,383
Published a year ago
Kildare and Wicklow Education and Training Board
140,000
Published a year ago
Tipperary County Council
–
Published a year ago
Tipperary Education and Training Board_1284
–
Published a year ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.