Stotles logo
Closed

PR5880 RFL Compliance Programme: Phase 2 - Compartmentation, Fire Doors and Fire Alarms

Published

Description

An Open Procedure was undertaken by Partners Procurement Service (PPS) on behalf of The Royal Free London NHS Foundation Trust. Suppliers were invited to tender for the provision of the Royal Free London Compliance Programme: Phase 2 Compartmentation, Fire Doors and Fire Alarms Works for Lot 1 Podium Works and Lot 2 Tower Works. Even though the procurement was run as two (2) separate Lots, the process was run under one procurement. Cuffe Plc emerged as the preferred bidder for both Lots. Lot 1: Lot 1: Fire Compliance Programme – Phase 2 – Compartmentation, Fire Doors and Fire Alarms Part 1, Podium Levels A bidder may bid for one or both lots, however, each submission for each lot is standalone and a full separate response is required for each lot to be compliant. The objective of the works is to address areas that present numerous fire safety deficiencies in the Royal Free Hospital, Hampstead building. This includes fire doors that are no longer fit- for-purpose or substandard, lack of fire-stopping and breaches in compartmentation as well as to ensure there is a fully compliant fire alarm system. These works are to ensure there is a fully compliant fire compartmentation and fire alarm system. The works generally consist of the following: • Design works as required; • Fire compartmentation repairs and alterations; • Fire door repairs and replacements; • Fire damper repairs and replacements; • Programming, commissioning and witness testing of installations progressively; and • Provision of accurate record drawings, zone plans, component logs and asset register. Fire Doors: All fire rated doors will be installed with 60-minute protection with associated ironmongery set out via door schedules Fire Dampers: Repair or installation of Blue River compatible smoke dampers will be commissioned and interfaced with the fire alarm systems on all current fire break breaches. The project may also extend to the removal of those fire and smoke dampers which are not required. This includes the physical removal of the redundant dampers along with their power and controls. Compartmentation: Fire compartment and sub compartment wall repairs will be as appropriate to the existing material which may be blockwork, stud and plasterboard or solid plaster panel construction. Fire rated lines will consist of 60 minutes to compartment line and 90 minutes to protected shafts and service risers. Fire Alarm: The objective of the works is to ensure there is a fully compliant fire alarm system to L1 throughout all areas, including the installation of additional detection, re-zoning, new sounder bases and removal of old equipment including bells and bell circuits. Central to these compliance objectives is the need for a design risk assessment, which should be undertaken as an integral design process, taking into account current use and occupancy of the areas concerned. Lot 2: Lot 2: Fire Compliance Programme – Phase 2 – Compartmentation, Fire Doors and Fire Alarms Part 2, Tower Levels A bidder may bid for one or both lots, however, each submission for each lot is standalone and a full separate response is required for each lot to be compliant. The objective of the works is to address areas that present numerous fire safety deficiencies in the Royal Free Hospital, Hampstead building. This includes fire doors that are no longer fit- for-purpose or substandard, lack of fire-stopping and breaches in compartmentation as well as to ensure there is a fully compliant fire alarm system. These works are to ensure there is a fully compliant fire compartmentation and fire alarm system. The works generally consist of the following: • Design works as required; • Fire compartmentation repairs and alterations; • Fire door repairs and replacements; • Fire damper repairs and replacements; • Programming, commissioning and witness testing of installations progressively; and • Provision of accurate record drawings, zone plans, component logs and asset register. Fire Doors: All fire rated doors will be installed with 60-minute protection with associated ironmongery set out via door schedules Fire Dampers: Repair or installation of Blue River compatible smoke dampers will be commissioned and interfaced with the fire alarm systems on all current fire break breaches. The project may also extend to the removal of those fire and smoke dampers which are not required. This includes the physical removal of the redundant dampers along with their power and controls. Compartmentation: Fire compartment and sub compartment wall repairs will be as appropriate to the existing material which may be blockwork, stud and plasterboard or solid plaster panel construction. Fire rated lines will consist of 60 minutes to compartment line and 90 minutes to protected shafts and service risers. Fire Alarm: The objective of the works is to ensure there is a fully compliant fire alarm system to L1 throughout all areas, including the installation of additional detection, re-zoning, new sounder bases and removal of old equipment including bells and bell circuits. Central to these compliance objectives is the need for a design risk assessment, which should be undertaken as an integral design process, taking into account current use and occupancy of the areas concerned. Lot 1: Lot 1: Fire Compliance Programme – Phase 2 – Compartmentation, Fire Doors and Fire Alarms Part 1, Podium Levels A bidder may bid for one or both lots, however, each submission for each lot is standalone and a full separate response is required for each lot to be compliant. The objective of the works is to address areas that present numerous fire safety deficiencies in the Royal Free Hospital, Hampstead building. This includes fire doors that are no longer fit- for-purpose or substandard, lack of fire-stopping and breaches in compartmentation as well as to ensure there is a fully compliant fire alarm system. These works are to ensure there is a fully compliant fire compartmentation and fire alarm system. The works generally consist of the following: • Design works as required; • Fire compartmentation repairs and alterations; • Fire door repairs and replacements; • Fire damper repairs and replacements; • Programming, commissioning and witness testing of installations progressively; and • Provision of accurate record drawings, zone plans, component logs and asset register. Fire Doors: All fire rated doors will be installed with 60-minute protection with associated ironmongery set out via door schedules Fire Dampers: Repair or installation of Blue River compatible smoke dampers will be commissioned and interfaced with the fire alarm systems on all current fire break breaches. The project may also extend to the removal of those fire and smoke dampers which are not required. This includes the physical removal of the redundant dampers along with their power and controls. Compartmentation: Fire compartment and sub compartment wall repairs will be as appropriate to the existing material which may be blockwork, stud and plasterboard or solid plaster panel construction. Fire rated lines will consist of 60 minutes to compartment line and 90 minutes to protected shafts and service risers. Fire Alarm: The objective of the works is to ensure there is a fully compliant fire alarm system to L1 throughout all areas, including the installation of additional detection, re-zoning, new sounder bases and removal of old equipment including bells and bell circuits. Central to these compliance objectives is the need for a design risk assessment, which should be undertaken as an integral design process, taking into account current use and occupancy of the areas concerned. Lot 2: Lot 2: Fire Compliance Programme – Phase 2 – Compartmentation, Fire Doors and Fire Alarms Part 2, Tower Levels A bidder may bid for one or both lots, however, each submission for each lot is standalone and a full separate response is required for each lot to be compliant. The objective of the works is to address areas that present numerous fire safety deficiencies in the Royal Free Hospital, Hampstead building. This includes fire doors that are no longer fit- for-purpose or substandard, lack of fire-stopping and breaches in compartmentation as well as to ensure there is a fully compliant fire alarm system. These works are to ensure there is a fully compliant fire compartmentation and fire alarm system. The works generally consist of the following: • Design works as required; • Fire compartmentation repairs and alterations; • Fire door repairs and replacements; • Fire damper repairs and replacements; • Programming, commissioning and witness testing of installations progressively; and • Provision of accurate record drawings, zone plans, component logs and asset register. Fire Doors: All fire rated doors will be installed with 60-minute protection with associated ironmongery set out via door schedules Fire Dampers: Repair or installation of Blue River compatible smoke dampers will be commissioned and interfaced with the fire alarm systems on all current fire break breaches. The project may also extend to the removal of those fire and smoke dampers which are not required. This includes the physical removal of the redundant dampers along with their power and controls. Compartmentation: Fire compartment and sub compartment wall repairs will be as appropriate to the existing material which may be blockwork, stud and plasterboard or solid plaster panel construction. Fire rated lines will consist of 60 minutes to compartment line and 90 minutes to protected shafts and service risers. Fire Alarm: The objective of the works is to ensure there is a fully compliant fire alarm system to L1 throughout all areas, including the installation of additional detection, re-zoning, new sounder bases and removal of old equipment including bells and bell circuits. Central to these compliance objectives is the need for a design risk assessment, which should be undertaken as an integral design process, taking into account current use and occupancy of the areas concerned.

Timeline

Publish date

3 years ago

Close date

3 years ago

Buyer information

Royal Free London NHS Foundation Trust

Email:
rf.ppstenders@nhs.net

Explore contracts and tenders relating to Royal Free London NHS Foundation Trust

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by Royal Free London NHS Foundation Trust

Explore more open tenders, recent contract awards and upcoming contract expiries published by Royal Free London NHS Foundation Trust.

Explore more suppliers to Royal Free London NHS Foundation Trust

Sign up