Pre-tender

Published

HiCrIS Full Design & Build

2 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Close date

2026-09-25

Description

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. The Hi-CrIS project is being developed under the Spherical Tokamak for Energy Production (STEP) programme. STEP plasma will be confined by electromagnets based on high temperature superconductors (SC). These magnetic components will form a substantial part of the STEP Prototype Powerplant (SPP) and represent ~25% of the total cost. With such a substantial element of the SPP being represented by the magnetic components, it is critical to have confidence in the lifetime predictions of the down-selected magnets. To achieve this, investigations of down-selected superconductor (SC) material samples are required under operational conditions: i.e., when SCs are simultaneously irradiated with fusion spectrum neutrons and gammas whilst at their cryogenic operating temperatures, carrying its rated current, and subject to strain and high applied fields (“fusion in-situ conditions”). STEP has an implementation plan for characterising Rare-earth Barium Copper Oxide (REBCO) for use in its magnetic field coils. This plan involves several key activities which, together, will provide sufficient experimental data to thoroughly examine the properties of a REBCO Coated Conductor (CC) and allow its use in each of STEP’s magnetic field coils to be justified (or not). Running several CCs through this process will then identify which CCs constitute the best choices for each magnetic coil. STEPs Hi-CrIS Test Rig will enable REBCO CCs samples to be subjected to STEP relevant neutron fluences, at cryogenic temperatures, so that the evolution of their superconducting properties can be determined and evaluated. The data will then be used in conjunction with STEP’s other characterisation activities to allow predictions about STEP’s performance in fusion in-situ conditions to be made and judged based on STEP’s requirements in terms of magnetic lifetime. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Machines-and-apparatus-for-testing-and-measuring./88EJ65WYMH To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/88EJ65WYMH

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

High Speed Two (HS2) Ltd

2,200,000,000 GBP

Published 20 hours ago

UK Atomic Energy Authority

0 GBP

Published 6 days ago

University of Essex

1,200,000,000 GBP

Published 13 days ago

High Speed Two (HS2) Ltd

Published 16 days ago

UK FUSION ENERGY LTD

70,000 GBP

Published 21 days ago

National Highways Limited

150,000 GBP

Published 22 days ago

Yorkshire Water Services Ltd

3,000,000,000 GBP

Published 23 days ago

Ordnance Survey

Published a month ago

Severn Trent Water Ltd

200,000,000 GBP

Published a month ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.