Awarded contract

Published

Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm

8 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Current supplier

H&MV Engineering

Description

Oweninny Power 2 DAC, the Contracting Entity , is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The Contracting Entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project. Oweninny Phase 2 wind farm is an 83MW project located adjacent to the existing 89MW Oweninny Phase 1 Project. The Contracting Entity plans to develop the phase 2 project commencing in 2020. Lot 1: The Contracting Entity intends to procure works, supplies and services related to electrical balance of plant for the Oweninny Phase 2 wind farm project. The scope of work for Contract shall include the design, procurement and installation for the following non-exhaustive list, however tenders should note that the detailed scope and contracting strategy will be determined at tender stage: 1. EBOP Civil Works 2. Earthing System for complete station and OEM plant areas 3. Auxiliary Power Supplies 4. Mechanical & Electrical Services 5. Grid connection works – underground cable or overhead line as required 6. HV End Masts or Cable Connection terminations 7. Grid Transformer 8. Neutral Earthing Resistor 9. MV Cable MV Cable Network 10. MV Switchgear MV Switchgear 11 Connection of Main LV and Standby supply 12. Fibre Optic Cable Network 13. Control & Protection as per Employers specifications 14. Connection to Revenue Metering 15. Installation and Wiring of OEM Cabinets 16. Installation and Wiring of Employers SCADA Cabinets 17.. Studies if specified 18. Design Process & Procedures 19. Testing and commissioning 20. Implementation of Employers Electrical Transfer Procedures including SAP 21. Operations & Maintenance requirements 22. Permanent Telecommunications for site 23. Fulfilling role of PSCS or Principal Contractor during all or part of the Works, which may include other parties on site 24. Met mast procurement and erection if required, including foundation and crane hardstanding Some post construction works/services during the project operational phase may also be included in the scope of the Contract. It is currently envisaged that the Contracting Entity shall enter into a Contract with the successful tenderer. However, Applicants should note that, in the alternative, the Contract may ultimately be entered into by any subsidiary or affiliate thereof, or by either of the shareholders in the Contracting Entity.

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Cavan and Monaghan Education & Training Board

363,492

Published 6 months ago

Waterford and Wexford Education and Training Board_110494

100,000

Published 6 months ago

Kildare and Wicklow Education and Training Board

234,361

Published 6 months ago

Kildare and Wicklow Education and Training Board

267,841

Published 6 months ago

Waterford City and County Council_103683

390,000

Published 7 months ago

Waterford City and County Council_103683

275,000

Published 7 months ago

Health Products Regulatory Authority

160,000

Published 9 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.