Awarded contract
Published
Construction work for buildings relating to air transport
11 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
Design and construction of Package 01 — T2 Transformation Phase 1 works as part of the Manchester Airport Transformation Programme (or MAN-TP). Manchester Airport is currently characterised by a fragmented three-terminal operation, supported by two runways, a transport interchange, various landside road networks and significant supporting infrastructure. Terminal One was opened in 1962 and has undergone significant expansion and redevelopment in the intervening years, most recently in 2007 — 2009. Terminal Two Opened in 1993 (along with the railway station) and has also undergone some redevelopment. Terminal Three, originally the domestic terminal, was opened in 1989 and benefited from significant investment with a major extension opening in 1998. There is the potential to modernise Manchester Airport in line with growing passenger and airline demand and expectations ‘over the coming years. Manchester Airport Plc (MA), part of the Manchester Airports Group, as part of their ten year capital investment programme plans to transform Manchester Airport (the Manchester Airport Transformation Programme or MAN-TP) and position the airport as the “Northern Gateway” and create a modern transport hub. MAN-TP is in response to key factors such as forecast passenger growth, changing customer and airline expectations and positioning Manchester Airport as a key component of the country's aviation system. MA wishes to commission the design and construction of Package 01 — T2 Transformation Phase 1 works as part of the MAN-TP. By way of overview, the proposed works comprise, but are not limited to, the following work elements: — New Baggage Factory — New Piers — New Terminal Extension Building — Forecourt Extension and Upgrade of Existing Forecourt — Associated Access Roads — Alterations to Existing Terminal — New Multi-storey Car Parks — Site Clearance — Associated Services Diversions The overall scope of works includes, but is not limited to: design and construction of building, civil and structural engineering, mechanical and electrical and IT works in connection with the work elements identified above and the management of interfaces. It is envisaged that this entire scope of works will be procured, via a negotiated process, under one NEC design and build contract that is structured in two stages: design and construction. A single contract will be entered into with the successful bidder for the two stages of the works required. MA however retains the option whether to extend the contract for delivery of second stage of works (construction) by the successful bidder and exercise of this option will be dependent upon (without limitation) the design works having been completed in accordance with MA's requirements. MA further retains the option to terminate the contract following completion of the design stage and reserves the right to negotiate with the second placed (or indeed any other lower ranking bidder as appropriate) in relation to delivery of the construction works required under the second stage of the project. MA has separately commissioned a design team together with a managed service provider (MSP). The development of the RIBA Stage 3 Developed Design will be undertaken by MA's appointed Architect and Engineer from December 2015 to May 2016. Given the nature of works required and the background described above, MA anticipates that this project will be led by a construction company that will procure its own design expertise (either externally or internally appointed). MA reserves the right however to discuss during the course of the negotiation phase, potential for the successful contractor engaging MA’s design team.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
County Durham and Darlington NHS Foundation Trust
197,238.16 GBP
Published a day ago
Westmorland and Furness Council
119,983.77 GBP
Published a day ago
Look Ahead Care and Support
10,000,000 GBP
Published a day ago
Leicester City Council
249,776.38 GBP
Published 4 days ago
Leicester City Council
63,893 GBP
Published 4 days ago
Bristol City Council
53,340 GBP
Published 4 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.