Awarded contract
Published
Replacement Lift within Ward Four (4) at Glangwili General Hospital (GGH)
70 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
Hywel Dda University Health Board (HDUHB) have a requirenment to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH). The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features. The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio. Scope of the Contract HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following: - A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow. - The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification. - The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission. The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016. Lot 1: Hywel Dda University Health Board (HDUHB) have a requirement to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH). The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features. The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio. Scope of the Contract HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following: - A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow. - The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification. - The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission. The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Derby City Council
110,000 GBP
Published 5 days ago
Derby City Council
110,000 GBP
Published 5 days ago
Southend-on-Sea Borough Council
400,000 GBP
Published 8 days ago
Southend-on-Sea Borough Council
–
Published 8 days ago
Awarded
DPS for Works & Maintenance
NHS London Procurement Partnership
1,690,000,000 GBP
Published 12 days ago
Ports of Jersey
–
Published 12 days ago
Southend-on-Sea Borough Council
–
Published 16 days ago
Southend-on-Sea Borough Council
75,000 GBP
Published 16 days ago
Plymouth Community Homes
–
Published 23 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.