Awarded contract
Published
Construction work
7 suppliers have saved this notice.
Looks like a fit? Save this tender and qualify it in Stotles
Description
The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Finnsås tunnel is 2 412 metre long. Two breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps. The Finnsås tunnel is 2 412 metre long. Two breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps.
Qualify tenders faster with AI summaries - see key details in the Stotles app
Unlock decision maker contacts.
Never miss a tender again
Get alerts, AI summaries and tools to qualify faster
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Statens vegvesen
–
Published 12 days ago
Awarded
E45 Kløfta - Utbedring og bygging av delstrekningen E01 Forberedende arbeid Alta – Suolovuopme
Statens vegvesen
–
Published 21 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.