Awarded contract

Published

Construction work

30 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Description

The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Finnsås tunnel is 2 412 metre long. Two breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps. The Finnsås tunnel is 2 412 metre long. Two breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. Main quantities: — the demolition and removal of the current PE foam — blasting works for breakdown bays — blasting works for niches for technical buildings — the delivery of new technical buildings — blasting works for new emergency stations — new water/frost protection work — trenches on both sides of the tunnels — the delivery and installation of a prefabricated cable duct including manholes — new flushing water pipes with sandtraps.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Statens vegvesen

Published 3 days ago

Oslo kommune v/ Oslobygg KF

Published 4 days ago

Statens vegvesen

Published 5 days ago

Statens vegvesen

Published 6 days ago

Movar Iks

Published 13 days ago

Oslo kommune v/ Boligbygg Oslo KF

Published 13 days ago

Oslo kommune v/ Boligbygg Oslo KF

Published 13 days ago

Movar Iks

Published 18 days ago

Movar Iks

Published 18 days ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.