Pre-tender

Published

NRW All Wales Mountain Bike Trail and Maintenance Framework

6 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

2,000,000 GBP

Description

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. • Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. Lot 2 – Mountain Bike Trail Design and Construction Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include: • Detailed trail design. • Securing all necessary permissions, approvals, consents and licences required for project delivery. • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. • Testing, commissioning and certification that the completed works are fit for purpose. • Formal handover of completed trails and associated documentation to the Client.

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

The Lake District National Park Authority

4,000,000 GBP

Published 2 days ago

Braintree District Council

980,000 GBP

Published 8 months ago

West Northamptonshire Council

150,000 GBP

Published 8 months ago

Wiltshire Council

3,889,000 GBP

Published a year ago

Blaby District Council

31,877.68 GBP

Published a year ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.