Awarded contract
Published
IA2425 Framework Agreement for Demolition and Associated Services
50 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
Framework Agreement for Demolition and Associated Services Lot 1: Framework Agreement for Demolition and Associated Services The below works associated with the Demolition of properties is not an exhaustive list of requirements covered by the Framework. • Allow for all necessary plans, surveys, risk assessments, method statements and reports to support the safe and successful demolition of properties • Obtaining relevant drawings and site plans, refurbishment / demolition survey from the Contracting Authority. • A full condition survey of the site is required covering the highways, hedges & trees, and existing systems and structures. • Preparation of Construction Phase Plan and Health and Safety files and Site Waste Management Plan • Erection of secure hoarding to an approved temporary works design, to be maintained for the duration of contracts. • Site compound and security set-up. • Secure pedestrian access to be provided via biometric turnstile for staff, operatives and visitors. • Segregated safe access walkways to be provided from turnstile to offices & to site working areas. • re-routing of footpaths to avoid pedestrians crossing the site entrance (if required). • Access to properties and walkways to be maintained throughout the works unless otherwise agreed. • Traffic management plan • Provision of welfare facilities for operatives, including site office and WCs. • Arrange for disconnection of existing services from the property, including confirmation that all services are no longer live. • Work with the Contracting Authority to obtain any necessary licenses including F10 notification to the HSE required to carry out the works, from the relevant authority. • Containment and removal of all Asbestos Containing Materials, where requested to arrange this in line with the Control of Asbestos Regulations 2012 and the Refurbishment & Demolition Survey included within Contracting Authority tender documentation. • The Contractor is to specifically ensure that no contamination of the site as a whole is allowed to occur. Certification demonstrating that the site is clean following the demolition works is required. • Provision of all other necessary health and safety measures, including Banks Men, safety signs and lockable gates. • Carry out Principal Contractor role in accordance with The Construction (Design and Management) Regulations 2015 (CDM 2015). Ensuring the demolition and dismantling of structures are planned and carried out in such a way as to prevent danger or, where this is not practicable, to reduce danger to as low a level as reasonably practicable. • Leaving boundaries in place as indicated on the site layout plan provided with the tender pack. • Protection of all tree root protection zones as outlined on architectural drawings • Comply and co-operate with ecologists and ecology surveys and plans • Comply and co-operate with arboriculture assessments and tree protection plans • Dust suppression using dust extraction machines and tools with e-vac attachments where required. • Noise monitoring using dB meters to ensure that safe sound levels are met to current legislation. • Close management of operatives using vibrating plant, ensuring they do not exceed safe vibration levels. • Fire escape routes will be clearly displayed on site, all escape routes will have signage displaying routes, to be updated accordingly as site develops. • Site preparation and clearance work to include soft strip out works to remove all non-structural elements inside and outside of a building to facilitate demolition works. • Demolish building(s) described down to ground level. Structures must be demolished in accordance with BS 6187. • Grubbing up and carting away of all existing footings and foundations to a depth of 1200mm (or greater if specifically requested) and/or • Sorting and salvage of demolished materials once property has been demolished unless otherwise agreed with the Contracting Authority. • Removal and disposal of all demolition material off site. • All waste products to be stored, transported, and disposed of in accordance with relevant legislation and regulations and site waste management plan ensuring licensed waste carrier and disposal station In addition to the above listed works associated with the demolition of properties the Framework also includes and is not limited to: • Dismantling and deconstruction including a range of deconstruction and dismantling techniques and building structures. • Carry out principal contractor role in accordance with The Construction (Design and Management) Regulations 2015 (CDM 2015). Ensuring the deconstruction and dismantling of structures are planned and carried out in such a way as to prevent danger or, where this is not practicable, to reduce danger to as low a level as reasonably practicable
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Nottingham City Council
299,000 GBP
Published 7 days ago
Department for Levelling Up, Housing and Communities (DLUHC)
12,250,000 GBP
Published 13 days ago
West Kent Housing Association
450,000 GBP
Published 16 days ago
Bradford Teaching Hospitals NHS Foundation Trust
108,680 GBP
Published a month ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.