Awarded contract

Published

Supply and Installation of Loose Furniture and Fittings at Dromroe Village, University of Limerick

35 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

375,176.56 EUR

Current supplier

Joseph Flanigan and Sons Ltd

Description

Supply and installation of: — living room furniture (dining tables and chairs, TV stands, beanbags and coffee tables), — reupholstering existing sofas and armchairs, — curtains, — blinds, — bedroom study chairs, — electrical white goods, — TV units. Lot 1: Living Room Furniture (dining tables and chairs, tv stand, beanbag and coffee tables) Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 2: Reupholstering existing Sofas and Armchairs Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 3: Curtains Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 4: Blinds Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 5: Bedroom Study Chairs Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 6: Electrical White Goods Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 7: TV Units Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme. Lot 8: All Items Loose furniture fit-out of Dromroe Village comprising 71 nr. six (6) bedroom apartments, 3 nr. five (5) bedroom apartments, 1 nr. three (3) bedroom apartment and 6 nr. two (2) bedroom apartments in 12 blocks. All bedrooms are en-suite. The scope of works to be carried out in Dromroe Village comprises supply and installation of kitchen and living room loose furniture items, bedroom study chairs, reupholstering sofas and arm chairs, electrical white goods, tv’s, blinds and curtains. The apartments in Dromroe Village will be refurbished on a phased basis over the Summers of 2018 and 2019. Approximately 50 % of the units will be refurbished in each phase and furniture deliveries will be required to meet this programme.

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

KARE_473

95,000

Published 5 months ago

Atlantic Technological University

Published 10 months ago

University College Dublin (UCD)

4,705,000

Published a year ago

National Paediatric Hospital Development Board

88,000

Published a year ago

Raidió Teilifís Éireann (RTÉ)

170,000

Published a year ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.