Awarded contract

Published

ARP23/01 Provision of a New SCADA System

63 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Buyer

Nexus

Close date

2024-01-26

Description

Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner.

Connect with key decision makers

Go beyond procurement contacts. Stotles gives you the decision makers that choose who gets the tender.

Managing Director

Chief Officer

Redacted

redacted@redacted.co.uk

+44 01234 567 890

Unlock decision maker contacts.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

United Kingdom Atomic Energy Authority

Published a day ago

National Highways Limited

375,000 GBP

Published 10 days ago

Fujitsu Services UK Ltd

1,750,000 GBP

Published 15 days ago

Department of Finance

42,000,000 GBP

Published 19 days ago

Kier Infrastructure and Overseas - CP7 NWC

75,000 GBP

Published 25 days ago

Epsom & St Helier University Hospitals NHS Trust

Published a month ago

Croydon Health Services NHS Trust

6,000,000 GBP

Published 2 months ago

Sizewell C Limited

7,500,000 GBP

Published 4 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.