Awarded contract

Published

ARP23/01 Provision of a New SCADA System

8 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Buyer

Nexus

Close date

2024-01-26

Description

Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner.

Connect with key decision makers

Go beyond procurement contacts. Stotles gives you the decision makers that choose who gets the tender.

Managing Director

Chief Officer

Redacted

redacted@redacted.co.uk

+44 01234 567 890

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Strathclyde Partnership for Transport

1,700,000 GBP

Published 19 days ago

Strathclyde Partnership for Transport

1,700,000 GBP

Published 19 days ago

West Suffolk NHS Foundation Trust

Published 23 days ago

Hillcrest HA Ltd

Published 2 months ago

Department of Finance

104,000,000 GBP

Published 2 months ago

Ministry of Defence

Published 2 months ago

Aberdeen City Council

Published 3 months ago

States of Guernsey

Published 3 months ago

Department of Finance

49,440,000 GBP

Published 3 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.