Awarded contract
Published
ARP23/01 Provision of a New SCADA System
8 suppliers have saved this notice.
Looks like a fit? Save this tender and qualify it in Stotles
Buyer
Close date
2024-01-26
Description
Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner.
Qualify tenders faster with AI summaries - see key details in the Stotles app
Never miss a tender again
Get alerts, AI summaries and tools to qualify faster
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Amgueddfa Cymru — National Museum Wales
–
Published 14 days ago
Fujitsu Services UK Ltd
1,750,000 GBP
Published 2 months ago
Department of Finance
42,000,000 GBP
Published 2 months ago
Kier Infrastructure and Overseas - CP7 NWC
75,000 GBP
Published 2 months ago
Epsom & St Helier University Hospitals NHS Trust
–
Published 3 months ago
Croydon Health Services NHS Trust
6,000,000 GBP
Published 4 months ago
Welsh Ambulance Service University NHS Trust
–
Published 4 months ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.