Description

Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner. Lot 1: Nexus is to appoint a Contractor to design, build, install, test, commission, carry out training, migrate and handover a new SCADA system. This system will replace the existing SCADA system, which is to be decommissioned and removed by the Contractor. The contract duration for delivery of this element is anticipated to be 24 months. The contractor will also be employed to provide a 3-year remote support package, with an option to extend to years 4 and 5. • When bringing into use a new SCADA system around the Nexus metro network, the following are considered strategic goals of the scheme: • The new SCADA system will be modern, reliable, highly configurable, and supportable. • The migration between the old and new SCADA system is as seamless as possible, minimising any material impact on rail operational activities. • The new SCADA system results in high level of end user satisfaction, from operational and maintenance end users • The new SCADA system is a supportable system, with Commercial off the Shelf (COTS) equipment, with a minimum 15 year lifespan for hardware. • The new SCADA system software will be able to operate on the Nexus virtual environment, provided on two virtual machines per physical data centre (2 number). • The existing SCADA system, consisting of the MIMIC panel, user screens, field end equipment and cabling will be fully recovered and disposed of in an environmentally friendly manner.

Connect with key decision makers

Go beyond procurement contacts. Stotles gives you the decision makers that choose who gets the tender.

Managing Director

Chief Officer

Redacted

redacted@redacted.co.uk

+44 01234 567 890

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Amgueddfa Cymru — National Museum Wales

Published 14 days ago

United Kingdom Atomic Energy Authority

Published 2 months ago

National Highways Limited

375,000 GBP

Published 2 months ago

Fujitsu Services UK Ltd

1,750,000 GBP

Published 2 months ago

Department of Finance

42,000,000 GBP

Published 2 months ago

Kier Infrastructure and Overseas - CP7 NWC

75,000 GBP

Published 2 months ago

Epsom & St Helier University Hospitals NHS Trust

Published 3 months ago

Croydon Health Services NHS Trust

6,000,000 GBP

Published 4 months ago

Welsh Ambulance Service University NHS Trust

Published 4 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.