Awarded contract

Published

Leasing of a Laser Powder Bed Fusion 3D Metal Printer

19 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

500,000

Description

The School of Engineering wanted to lease a Laser Powder Bed Fusion 3D Metal Printer for a fixed term of 3 years with the option to have extended for up to an additional 2 years. The metal printer would have supported world-leading research utilising new materials and printing methods and extended the capability of the 2D and 3D printing currently undertaken within the school. Applications for metal printing can be found in aerospace, defence, automotive, healthcare, and many other industries and will lead to revolutionary new medical, electronic, mechanical, optical, acoustic, heat transfer, and sensing devices being designed and manufactured. This is due to the many advantages, including design flexibility, product customisation, and minimisation of material waste, that printing offers over subtractive manufacturing. The use of Additive Manufacturing (AM) means that geometrics are no longer constrained to the limited base stock that components are traditionally machined from. Lot 1: The School of Engineering wanted to lease a Laser Powder Bed Fusion 3D Metal Printer for a fixed term of 3 years with the option to have extended for up to an additional 2 years. The metal printer would have supported world-leading research utilising new materials and printing methods and extended the capability of the 2D and 3D printing currently undertaken within the school. Applications for metal printing can be found in aerospace, defence, automotive, healthcare, and many other industries and will lead to revolutionary new medical, electronic, mechanical, optical, acoustic, heat transfer, and sensing devices being designed and manufactured. This is due to the many advantages, including design flexibility, product customisation, and minimisation of material waste, that printing offers over subtractive manufacturing. The use of Additive Manufacturing (AM) means that geometrics are no longer constrained to the limited base stock that components are traditionally machined from. The University conducted this procurement using the Open Procedure in accordance with the requirements of the Regulations for the purpose of procuring goods described in the Specification. The University proposed to enter into a Contract for up to five years and six months. This was to be the maximum contract period. This comprised of an initial contract period of three years and six months for the provision of the equipment and initial lease term, with an optional extension period of two years additional leasing.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

United Kingdom Atomic Energy Authority

180,000 GBP

Published 2 days ago

United Kingdom Atomic Energy Authority

Published 2 days ago

Scottish Borders Council

103,630 GBP

Published 5 days ago

Procurement for Housing Ltd (t/a PfH Scotland)

162,500,000 GBP

Published a month ago

Nottinghamshire County Council

75,000 GBP

Published 2 months ago

Blaenau Gwent County Borough Council

574,452.34 GBP

Published 2 months ago

Manchester City Council

1,758,000 GBP

Published 2 months ago

Tees Esk and Wear Valleys NHS Foundation Trust

1,486,500 GBP

Published 3 months ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.