Awarded contract

Published

Design services for ACF CR3 Dry Air Cooler Replacement

10 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

497,000 GBP

Current supplier

RSP CONSULTING ENGINEERS LLP

Description

The University of Edinburgh (Building Services Group) has appointed a contractor to provide Building Services Design Consultancy Services to redesign the cooling system serving Computer Room 3 (CR3) at the Advanced Computer Facility (ACF), located at the University of Edinburgh Easter Bush Campus. This includes surveys of the existing system and controls, desktop reviews of the existing system information and a design to RIBA Stage 3 with associated costings. The contract includes provision to extend services up to RIBA Stage 7, subject to the availability of future funding and the necessary approvals. Contract Period The contract start date is 26th March 2026, to allow the supplier to complete the cooling system redesign to RIBA stage 3 by 25th September 2026. The call-off contract commenced on 26th March 2026 and shall continue for a period of up to five (5) years (until 25th March 2031), or until completion of the Services (including any instructed Stages 4–7), whichever occurs sooner. Lot 1: The University of Edinburgh (Building Services Group) has appointed a contractor to provide Building Services Design Consultancy Services to redesign the cooling system serving Computer Room 3 (CR3) at the Advanced Computer Facility (ACF), located at the University of Edinburgh Easter Bush Campus. This includes surveys of the existing system and controls, desktop reviews of the existing system information and a design to RIBA Stage 3 with associated costings. The contract includes provision to extend services up to RIBA Stage 7, subject to the availability of future funding and the necessary approvals. Contract Period The contract start date is 26th March 2026, to allow the supplier to complete the cooling system redesign to RIBA stage 3 by 25th September 2026. The call-off contract commenced on 26th March 2026 and shall continue for a period of up to five (5) years (until 25th March 2031), or until completion of the Services (including any instructed Stages 4–7), whichever occurs sooner.. Award against framework: Direct Award utilising the 0920 Scotland Excel Building & Construction Consultancy Framework, Lot 3 - Mechanical, Electrical and Plumbing Engineering.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Inverness City Heritage Trust

28,320 GBP

Published 4 days ago

Tameside Metropolitan Borough Council

39,962.5 GBP

Published 4 days ago

North Lanarkshire Council

32,760 GBP

Published 6 days ago

Central Swindon North Parish Council

428,063 GBP

Published 7 days ago

Tees Valley Combined Authority

300,000 GBP

Published 11 days ago

Blackpool Council

466,917 GBP

Published 19 days ago

Foreign, Commonwealth and Development Office

837,160.68 GBP

Published 20 days ago

Transport for London

133,103.95 GBP

Published 20 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.