Open tender

Published

Scottish Trunk Road NMC - North West - A9 Scrabster Long Term Solution

6 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Close date

2026-08-17

Description

BEAR Scotland requires a specialist geophysical survey to support the development of the A9 Scrabster Long Term Solution. The works are required to inform the ground model for steep natural slopes upslope of the A9 Trunk Road on the approach to Scrabster Harbour, where landslide activity presents an ongoing risk to the trunk road network. The survey is intended to complement intrusive ground investigation information and assist in identifying the thickness and variability of colluvial deposits, the nature and distribution of underlying superficial deposits, and the depth to engineering rockhead. The tender shall be a performance specification and expect the work to be carried out using Electrical Resistivity Tomography (ERT) which assesses soil composition, rock head levels, and groundwater. The survey area comprises steep natural slopes between the local road at the slope crest and the A9 Trunk Road at the slope toe. Slopes are typically up to approximately 40 m high, and access to significant parts of the slope is expected to require industrial rope access techniques. Full road closures will not be permitted on the A9 Trunk Road or the local road network, and the works must be planned to maintain the safe operation of both roads. The scope is expected to comprise approximately five to ten geophysical survey transects, with potential for additional transects if required. The successful contractor will be responsible for selecting and justifying suitable geophysical techniques, undertaking survey planning and site reconnaissance, providing rope access capability, acquiring and processing the survey data, interpreting the results against available topographic and ground investigation information, and producing an interpretative report with associated digital outputs. Geophysical investigations require careful programming and timely delivery, as several subsequent activities, including GI works and the installation of a debris flow barrier, are dependent on access to the slope. Programme: Mid/late October 2026 duration of 2 weeks. Award Criteria: Quality/ Price (40/60) Estimated Value: GBP60,000

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

United Utilities Water Ltd

Published a day ago

Department of Finance

408,000 GBP

Published a month ago

Argyll and Bute Council

Published 2 months ago

Committee on Radioactive Waste Management

960,000,000 GBP

Published 2 months ago

London Borough of Haringey

115,000 GBP

Published 3 months ago

Forestry and Land Scotland

5,000,000 GBP

Published 3 months ago

Forestry and Land Scotland

5,000,000 GBP

Published 3 months ago

Sizewell C Limited

3,750,000 GBP

Published 4 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.