Awarded contract

Published

Technical analysis or consultancy services

8 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Current supplier

Mott MacDonald Limited

Description

SONI has the responsibility as the transmission system operator (TSO) under its license to plan the network and develop the transmission network to complete all the relevant activities (‘pre-construction’) to enable Northern Ireland Electricity, the transmission asset owner (TAO), to complete the construction and connection to the grid. As a part of the development role SONI requires the services of multiple specialist consultants to assist with the development of the Northern Ireland Electricity Transmission System Assets based on customer and network requirements. SONI intends to establish a single vendor framework per Lot for the provision of these services. SONI has undertaking this Procurement exercise and has identified a single vendor for each applicable Lot. SONI has the responsibility as the transmission system operator (TSO) under its license to plan the network and develop the transmission network to complete all the relevant activities (‘pre-construction’) to enable Northern Ireland Electricity, the transmission asset owner (TAO), to complete the construction and connection to the grid. These pre-construction activities include: Project feasibility studies; Preliminary design, route and site selection; Site survey; Project management; High voltage electrical engineering, civil / structural / mechanical engineering; Environmental impact assessments; Preparation of planning applications; Detailed design and construction drawings; Management of planning process; Landowner engagement and consent; Public and stakeholder consultation management; and Project communications. Lot 1 relates to Advice on Project Feasibility — Pre-construction development of Transmission Assets. SONI has the responsibility as the transmission system operator (TSO) under its license to plan the network and develop the transmission network to complete all the relevant activities (‘pre-construction’) to enable Northern Ireland Electricity, the transmission asset owner (TAO), to complete the construction and connection to the grid. These pre-construction activities include: Project feasibility studies; Preliminary design, route and site selection; Site survey; Project management; High voltage electrical engineering, civil / structural / mechanical engineering; Environmental impact assessments; Preparation of planning applications; Detailed design and construction drawings; Management of planning process; Landowner engagement & consent; Public and stakeholder consultation management; and Project communications. Lot 2 relates to Design Services — Substation Design — Pre-construction development of Transmission Assets. SONI has the responsibility as the transmission system operator (TSO) under its license to plan the network and develop the transmission network to complete all the relevant activities (‘pre-construction’) to enable Northern Ireland Electricity, the transmission asset owner (TAO), to complete the construction and connection to the grid. These pre-construction activities include: Project feasibility studies; Preliminary design, route and site selection; Site survey; Project management; High voltage electrical engineering, civil / structural / mechanical engineering; Environmental impact assessments; Preparation of planning applications; Detailed design and construction drawings; Management of planning process; Landowner engagement & consent; Public and stakeholder consultation management; and Project communications. Lot 3 relates to Design Services — Cable Design — Pre-construction development of Transmission Assets. SONI has the responsibility as the transmission system operator (TSO) under its license to plan the network and develop the transmission network to complete all the relevant activities (‘pre-construction’) to enable Northern Ireland Electricity, the transmission asset owner (TAO), to complete the construction and connection to the grid. These pre-construction activities include: Project feasibility studies; Preliminary design, route and site selection; Site survey; Project management; High voltage electrical engineering, civil / structural / mechanical engineering; Environmental impact assessments; Preparation of planning applications; Detailed design and construction drawings; Management of planning process; Landowner engagement & consent; Public and stakeholder consultation management; and Project communications. Lot 4 relates to Design Services — Overhead Line Design — Pre-construction development of Transmission Assets.

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Ministry of Housing, Communities & Local Government, Northeast, 2nd floor, Fry Building

206,061.44 GBP

Published 7 days ago

Department for Transport (DFT)

3,390,000 GBP

Published 15 days ago

East Lothian Council

95,093.09 GBP

Published 16 days ago

East Ayrshire Council

146,379.22 GBP

Published 16 days ago

North Lanarkshire Council

193,500 GBP

Published 18 days ago

University of Edinburgh

497,000 GBP

Published 18 days ago

West Midlands Combined Authority

14,976 GBP

Published 18 days ago

Department for Environment, Food & Rural Affairs (DEFRA)

60,000 GBP

Published 22 days ago

Scottish Water

9,000,000,000 GBP

Published 23 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.