Open tender
Published
Request for Tender for Blending Control Upgrade Project at Smartply Europe DAC ‘25
77 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
Smartply Europe DAC operates an Oriented Strand Board (O.S.B.) manufacturing facility at Belview Port Waterford. This modernisation project will target the Blending area of the plant. Project Objectives Upgrade the existing Blending area control system, Motor Control Centre (MCC) and PLC Local and Remote-control cabinets to meet current Smartply Machinery Safety Standards, ATEX compliance and programming Standards. Project scope to include: 4 x Dry bin infeed conveyor system. 4 x Dry Bin slide gates. 3 x Dry Bins. 3 x Blender infeeds system. 3 x Blenders. 1 x Resin, Wax and water addition system. Exclusions: Atomiser control system inside the Blenders OEM scope. • It will be the responsibility of the System integrator to Project Manage all elements of the Blending area control upgrade project i.e. System design, Electrical schematics and calculation’s, Process PLC, Safety PLC, SCADA upgrade, Networking, Risk assessment and risk reduction and Plant area ATEX compliance with reference to applicable standards in appendix 1. Over the course of this project a separate electrical contractor will be appointed to provide independent installation of cabling, containment, connections, and testing. Over the course of this project a separate mechanical contractor will be appointed to provide independent supply and installation of safety guarding and access gates. • The upgrade will include the replacing of existing Legacy PLCs with an Allen Bradley Guard Logix area PLC system. Existing functionality of the current Blender system must be preserved and available following the upgrade. All signal exchange control / safety to other mill PLCs should be maintained and realised in the new area PLC. It will be the responsibility of the System integrator to Program and test the new Blending area Allen Bradley PLC system and provide full Site acceptance testing documentation to the client. It will be the responsibility of the System integrator to provide a Declaration of Conformity for the Blending area PLC Control system upgrade. • It will be the responsibility of the System integrator to coordinate Design and Review meetings with the Client. Appoint an ATEX Designer for the project, deliverables include complete Electrical and Loop drawings for the control system detailing IS calculations, motor control, and device field wiring. Provide Smartply with a field device parts list to replace existing devices which comply with Plant area ATEX requirements Smartply will complete procurement of these parts. The System Integrator is responsible for providing the client with a Blending plant area ATEX verification Dossier on project handover this should include all required information detailed in appendix 2. It will be the responsibility of the System integrator to provide updates for inclusion in the Smartply Explosion Protection Document (EPD)Project implementation Deliverables Project implementation phase must be full installed, commissioned, tested and handed over to the client following the plant 11-day maintenance shutdown. Project preparation work can be completed on plant maintenance days one per month. *** Please note the above is not the full scope of Works - See attached tender Document for the full more detailed scope of Works ***
Personalised AI Summary
Unlock decision maker contacts.
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Scoil Mhuire Community School (Clane)
–
Published 21 hours ago
Electricity Supply Board (ESB)
–
Published 2 days ago
Awarded
Resident Mechanical and Electrical Engineering Services - Portlaoise Garda Divisional Headquarters
Office of Public Works (OPW)
1 EUR
Published 13 days ago
Heritage Eco Pods
350,000 EUR
Published 17 days ago
Kerry County Council_1204
–
Published 23 days ago
Beaumont Hospital_403
370,000 EUR
Published 23 days ago
Meath County Council
1,500,000 EUR
Published 24 days ago
Carlow County Council
1,700,000,000 EUR
Published a month ago
Carlow County Council
1,700,000,000 EUR
Published a month ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.