Awarded contract

Published

Fire Safety Consultancy - Byker

6 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

354,000 GBP

Current supplier

Part B Group

Description

GAP analysis and a Retrospective Fire Strategy report that presents the key fire safety aspects for each of the 3no BSR Registrations listed below: BYKER WALL (DUNN TERRACE) - BSR Registration - HRB12665Y4Q2 • BYKER WALL (SHIPLEY STREET) - BSR Registration - HRB12659C5R6 • BYKER WALL (GRACE LEE) - BSR Registration - HRB12215H3Y7 • Pilot Scheme - Byker Crescent • Low-Rise Buildings Lot 1: GAP analysis and a Retrospective Fire Strategy report based on Karbon Homes scope that presents the key fire safety aspects for each of the 3no BSR Registrations listed. This will include fire engineering assessments where the building does not meet standard guidance (e.g. Approved Documents). A set of compartmentation plans will be developed to illustrate the fire resistance and its location. The retrospective fire strategy will be carried out in the following process; 1. An initial set of compartmentation plans will be developed based on the fire guidance at the time. The purpose of the plans is to illustrate the anticipated areas of fire resistance the levels which are to be confirmed via a compartmentation survey. 2. A compartmentation survey is to be carried out based on the initial mark ups. The cause and effect of the detection and warning system and smoke control arrangement will be assessed where appropriate. As part of the site visit PartB carry out a 3D scan where possible and/or desired. 3. Development of the retrospective fire strategy which will contain the findings and confirmations of the survey using the fire guidance at the time of construction as the basis. There will be a GAP analysis carried out as part of this which will highlight areas that need to be addressed. An allowance for five virtual meetings have been included (up to 1 hour). As outlined within the Karbon Homes report format, the retrospective fire strategies will be formatted as follows: • Executive Summary • Limitations of report • Statutory legislation and what Building Regulations of the time were • Means of warning • Means of escape • Internal fire spread/ passive fire protection • External fire spread • Access/Facilities for the fire and rescue service • Fire safety management of the building • Fire safety systems within the building • Property protection and enhanced life safety systems

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Orbit Group Ltd

455,000 GBP

Published 3 days ago

Salix Homes Limited

63,000 GBP

Published 6 days ago

Southside Housing Association Ltd

153,269.25 GBP

Published 19 days ago

Southside Housing Association Ltd

153,269.25 GBP

Published 19 days ago

Derby Homes Ltd

1,900,000 GBP

Published a month ago

University of Dundee

220,000 GBP

Published a month ago

University of Dundee

220,000 GBP

Published a month ago

University of Chester

60,000 GBP

Published a month ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.