Stotles logo

Published

Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement

47 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Description

The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes. The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liability, £5m Professional Indemnity KBS Maritime - Introduction KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead. Project Background KBS Maritime have a requirement to design and install a berthing pontoon and structure to support the tug operations relating to Portsmouth Naval Base. The pontoons shall have the compatibility to interchange between the existing structure and the newly designed installation. For the newly designed structure, the Contractor shall assume a piled retention system with a max berthing force requirement of 800T. The design and subsequent works will require an investigation/survey of the seabed; construction of the civil engineering enabling works; installation (including mechanical and electrical services). Additionally, the removal and disposal of the existing pontoon and piles shall be considered. Key Dates (approximate) Expressions of Interest: 08 August 2023 ITT Published: 14 August 2023 ITT Close: 28 September 2023 Bidders Selected: 31 October 2023 Construction commencement: Nov 2023 Construction Completion: TBC   Additional information: If you are interested in this opportunity, please contact Paul Homshaw - at Tenders@kbsmaritime.com to express interest, quoting ref WAT-0044-02 Design and Install a Tug Berth Pontoon Replacement. Please also visit Asite Marketplace to register as a supplier. Once registered / if you are already a registered user, please email tenders@kbsmaritime.com to be added to our connected supply list, quoting full Company Name. Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received. A Non-Disclosure Agreement will also be required, prior to participating in a Pre Qualification and/or Invitation to Tender

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Argyll and Bute Council

Published 2 months ago

Argyll and Bute Council

Published 2 months ago

Gentoo Group Ltd

Published 3 months ago

Caledonian Maritime Assets Ltd (Utility)

Published a year ago

Caledonian Maritime Assets Ltd (Utility)

Published a year ago

Ports of Jersey

40,000,000 GBP

Published 3 years ago

Transport for London

Published 5 years ago

Transport for London

Published 6 years ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.