Description
The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below – a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete. Those that meet the criteria of this initial phase will be invited to participate in a final competition. Deadlines for expressions of interest are the 27th March. Any expressions received after this date will not be accepted
Qualify tenders faster with AI summaries - see key details in the Stotles app
Never miss a tender again
Get alerts, AI summaries and tools to qualify faster
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.