Awarded contract

Published

FRAM833/23

93 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

40,003.8 GBP

Current supplier

22live Limited

Description

The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall. The University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots: • Lot 1 - PA System • Lot 2 - Mixing Console & Stage Boxes • Lot 3 - Lighting Systems Lot 1: PA System Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. For the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). Any system design will need to integrate with the above existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024. Lot 2: Mixing Console & Stage Boxes Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. We require any console supplied to be compatible with the existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024. Lot 3: Lighting System Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Driver and Vehicle Licensing Agency

24,088.75 GBP

Published 4 days ago

Staffordshire Commissioner Police Fire and Rescue Crime

Published 6 days ago

NHS Shared Business Services

500,000,000 GBP

Published 7 days ago

Greater Manchester Combined Authority

866,666,666.7 GBP

Published 14 days ago

University of Strathclyde

63,956 GBP

Published 14 days ago

Dundee City Council

119,730 GBP

Published 19 days ago

University of Edinburgh

109,912.43 GBP

Published 25 days ago

West Hertfordshire Hospitals NHS Trust

215,000 GBP

Published a month ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.