Open tender

Published

BLD0323-02 03 Fire Strategies Phase 2 & 3

6 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Close date

2028-01-05

Description

Building Inspection & production of FIRE STRATEGY’ REPORTS in accordance with the following. Building Regulations Part ‘B’ & all amendments. (This document is the primary document that PNB operates against) Regulatory reform [fire safety] Order COSHH Regulations. The ‘Fire Strategy’ investigations and production of fire strategy reports shall be carried out by a ‘competent person’ who shall meet the relevant experience and qualifications to produce comprehensively the requirements of this SoR. The fire strategists shall be qualified as follows: - Professional qualifications. Degree qualified and be Members or Fellow Members of the Institute of Fire Engineers Minimum of 10 years’ experience in the field of ‘Fire Strategy’ reporting based on existing buildings. Have a working Knowledge of:- Experience with IOSH Managing Safely. Carry NEBOSH National General Certificate. Carry HABC Level 2 award in fire safety. BAFE registered. ISO9001 Loss Prevention Certification Board (LPPC).Fire Industry Association (FIA).United Kingdom Accredited Service (UKAS).FIRAS Certification. TRADA. The qualifications and verification of expertise and experience of proposed personnel shall be clearly defined as part of the tender procedure. Changes to the staff presented within the tender are only to be changed if agreed with the Project Manager at the time of the negotiations and contract awarded. It is important that the quality and relevant experience of team members is maintained throughout the contract until handover.

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.