Awarded contract

Published

Design and Build Contractors (Minor Works) Framework Agreement

6 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Current supplier

Bartlett Contractors Limited

Description

Design and build (minor works) projects, covering potable and waste water, including new works and / or the refurbishment, replacement, and maintenance of existing assets including cyclical maintenance programmes. Lot 1: Non-Infrastructure Works (potable water and wastewater) a) Potable water non-infrastructure scope includes, but is not limited to; i. Refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, ii. Disinfection, surge protection, chemical dosing, pumping systems and supervisory control, iii. Run-to-waste facilities, cartridge filters and UV, iv. Increased power resilience, v. New service reservoirs and inspection and maintenance of existing service and storage reservoirs. b) Wastewater non-infrastructure scope includes, but is not limited to; i. Refurbishment, replacement and provision of new inlet screens, ii. MCC (Motor Control Centre) replacement and associated DNO (Distribution Network Operator) works, iii. Stormwater storage, iv. Event duration monitors, v. Settlement tanks, vi. Modular treatment equipment, vii. Digester roof replacement, viii. Chemical dosing, ix. Phosphorous removal, x. Odour control and increased power resilience. Lot 2: Infrastructure Works (potable water and wastewater) a) Potable water infrastructure scope includes, but is not limited to; i. Distribution mains and lead communications pipe replacement, ii. Pressure management activities, iii. Inspection and maintenance of aqueducts, bridges and tunnels, iv. Reservoir maintenance and upgrades. b) Wastewater infrastructure programme includes, but is not limited to; i. New rising mains and their replacement, ii. Refurbishment of stormwater management systems (inc. Tanks, overflow channels, outlets etc), iii. Gravity solutions to maintain asset health and accommodate growth together with pipe bridge inspections, iv. Sustainable urban drainage (suds) and the need to respond effectively to emergency works that are generally pipeline related, v. Sewage pumping station refurbishments, enhanced power resilience, switchgear and transformer replacement

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Central Swindon North Parish Council

428,063 GBP

Published 20 hours ago

Ministry of Defence

121,000,000 GBP

Published 2 days ago

Nottingham University Hospitals NHS Trust

100,000 GBP

Published 2 days ago

Tees Valley Combined Authority

300,000 GBP

Published 5 days ago

Great British Nuclear ("GBN")

359,000,000 GBP

Published 5 days ago

Wandle Housing Association

148,625 GBP

Published 7 days ago

Environment Agency

294,952.24 GBP

Published 7 days ago

Salvation Army Housing Association

537,819 GBP

Published 8 days ago

Transport for London

133,103.95 GBP

Published 14 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.