Awarded contract
Published
Turnkey for a new extension for Froland Secondary School (FUS)
8 suppliers have saved this notice.
Looks like a fit? Save this tender and qualify it in Stotles
Buyer
Current supplier
BRG ENtreprenør AS
Description
The procurement concerns a turnkey contract for an extension for Froland Secondary School (FUS). FUS is currently a three-parallel school. There is a need to expand the existing school building, and, at the same time that there is an expected population growth in the municipality in the coming years, a decision has been made to extend the existing secondary school to a four-parallel school. A new extension is to be established on the back side of the existing buildings. The new building of total approx. 1500 m2 will have three floors (partial basement plus two floors), with a connection to the existing buildings on all floors. In addition the old lifting platform with a shaft in the existing school building is to be demolished and a new lift with an accompanying new shaft is to be established in the same place. The construction start is scheduled for the start of May 2023, subject to a decision in Froland Municipal Council and financing. The hand over is scheduled for 15.06.2024 with a 12 month trial operation. See part II of the tender documentation for further details on the procurement. Lot 1: The procurement concerns a turnkey contract for an extension for Froland Secondary School (FUS). FUS is currently a three-parallel school. There is a need to expand the existing school building, and, at the same time that there is an expected population growth in the municipality in the coming years, a decision has been made to extend the existing secondary school to a four-parallel school. A new extension is to be established on the back side of the existing buildings. The new building of total approx. 1500 m2 will have three floors (partial basement plus two floors), with a connection to the existing buildings on all floors. In addition the old lifting platform with a shaft in the existing school building is to be demolished and a new lift with an accompanying new shaft is to be established in the same place. The construction start is scheduled for the start of May 2023, subject to a decision in Froland Municipal Council and financing. The hand over is scheduled for 15.06.2024 with a 12 month trial operation. See part II of the tender documentation for further details on the procurement.
Qualify tenders faster with AI summaries - see key details in the Stotles app
Unlock decision maker contacts.
Never miss a tender again
Get alerts, AI summaries and tools to qualify faster
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Statens vegvesen
–
Published 16 days ago
DIverse eksterne konsulenter
–
Published 22 days ago
Bømlo kommune
–
Published 24 days ago
Statens vegvesen
–
Published a month ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.