Awarded contract

Published

S30005 Technical Approval for ANPR Camera Brackets on Parapets 2025-2028

2 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

132,737.09 GBP

Current supplier

OVE ARUP & PARTNERS LIMITED

Description

The Consultant will manage the AIP approval process for the attachment of ANPR cameras and associated mounting brackets onto bridge parapets (vehicle and/or pedestrian parapets). The Consultant will receive an initial enquiry from a Police authority and/or ANPR camera installer and will respond with a standard list of information required to be supplied to enable an AIP document and a Design and Check certificate to be prepared. Note: the Consultant will not be required to undertake on-site surveys or inspections (apart from in exceptional circumstances). All required information must be supplied by the Police and/or their appointed installer. The Consultant must receive written evidence from the appointed installer that they have been in contact with the National Highways managing agents within whose area the bridge(s) are located, and obtain permission for a bracket and associated works (cabling, power supply etc) to be carried out at the candidate bridge(s). To assist the preparation of the installer's method statement for the installation of the bracket and camera, the Consultant will provide a preliminary or typical bracket drawing(s) from a set of agreed bracket drawings, and a draft AIP to illustrate the requirements for typical proposals - refer to b) and c) below. The appointed installer must advise whether the project is notifiable under the Construction (Design and Management) Regulations 2015. If the project is notifiable then the appointed installer must supply details of the CDM coordinator. Before submitting the AIP document to National Highways, the Consultant will require written evidence from the appointed installer that the proposed design meets the needs of the Police. The Consultant will review the installer's method statement for the installation of the bracket and camera from a health and safety point of view as the installation will be undertaken above a live carriageway on the network. The Consultant will also review the installer's risk assessments, related to the installation of the ANPR camera.

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

National Highways Limited

49,863 GBP

Published a day ago

National Highways Limited

104,918.19 GBP

Published a day ago

National Highways Limited

63,629 GBP

Published a day ago

National Highways Limited

55,367 GBP

Published a day ago

National Highways Limited

358,402.04 GBP

Published a day ago

Department for Education

50,000 GBP

Published 4 days ago

National Highways Limited

97,979.44 GBP

Published 6 days ago

National Highways Limited

168,204.58 GBP

Published 12 days ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.