Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets

57 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Value

1,200,000 GBP

Close date

2025-08-25

Description

Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council. Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB). Until 2014, LRL had an Anaerobic Digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the anaerobic digestion process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid. The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 4000 hours prior to being decommissioned, having being installed circa 2010. As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at: Lancashire Renewables Limited Farington Waste Recovery Park Sustainability Way Leyland PR26 6TB To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 01/04/2026. It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. It is therefore likely that the contract will include provision for this, although it is to be decided at a later date whether this will be exercised.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

The Industrial Dwellings Society (1885) Ltd

700,000 GBP

Published 2 days ago

Riverside

2,000,000 GBP

Published 2 months ago

Network Rail

70,000,000 GBP

Published 3 months ago

Cardiff University

Published 3 months ago

Onward Homes

10,000,000 GBP

Published 3 months ago

London Borough of Hillingdon

2,100,000 GBP

Published 3 months ago

Wolverhampton Homes

Published 3 months ago

London Borough of Hounslow

Published 3 months ago

London Borough of Barnet Council

10,000,000 GBP

Published 3 months ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.