Pre-tender
Published
Guildhall Mechanical CWP Design [3 lots]
44 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: North Wing & 65 Basinghall/GJR; East Wing; West Wing. This will result in design and project management of the cyclical works projects across the Guildhall. The Consultant for each lot is to provide professional services as defined in the respective applicable part of Section 3 Lot 1, 2 or 3 of this brief. The lots will be split according the following principles: a. Lot 1 - North Wing & 65 Basinghall Street: i. Generally the North Wing mechanical services are relatively modern, with plant maintained and upgraded since 2007 inter alia main AHUs upgraded in 2020, along with heating and BEMS upgrades between 2020 and 2024. ii. Perimeter heating systems still require some control refinement. FCUs across the North Wing are due for replacement. iii. Some design work has taken place to reduce cold spots. iv. Heating pipework has had some remedial work taking place due to leaks developing on galvanised steel pipework and fittings. v. Kitchen ventilation systems are due to be upgraded, which could realise energy savings and potentially rationalise the hydraulic arrangement with regards to air flows and interlocks. vi. Domestic Hot Water Systems are to be replaced following capacity assessment along with shower valves in the Lower Ground Floor. vii. The steam humidification system serving the main office was decommissioned some years ago. A design to reinstate a humidification system to the vent is to be provided, ideally retaining the existing AHU chassis, as these are not due for replacement. viii. Overall, the plant replacement strategy has been to upgrade BEMS and now due to follow with emitters and make improvements along the way. ix. Chillers and pumps have been replaced as part of a major works project, which is currently on-site. x. 65 Basinghall Street is also known as Guildhall Justice Rooms or GJR. xi. The old main CER room is located here and fed from the same chiller as the office area. xii. The chiller is to be decommissioned, a replacement service is to be designed and provided. The CER xiii. The FCUs serving GJR are noted as being difficult to service and have 3P valves which create a by-pass which adversely affects return temperatures back to Citigen. b. Lot 2 – Guildhall Yard East (GYE) i. There is currently a BEMS replacement project in pre-start phase with Sykes & Son on D&B contract. ii. The Private part of the building is demised to the City Of London Police. There is a major refurbishment planned for this part of the building, which is currently in the design phase. iii. Mechanical emitters are due for replacement across the Public side of the building. iv. Pumps serving both Public and Private areas have recently been replaced. v. AHUs serving the Public areas were upgraded in 2021 along with the BEMS that controls them. vi. The general replacement/upgrade strategy for systems excluding the AHUs, is to replace and upgrade the emitters following on from the BEMS works. c. Lot 3 – West Wing i. Mechanical systems are beyond end of working life and controlling the environment is extremely and increasingly challenging for FM to manage. ii. Systems need to be replaced and upgraded to achieve another 5 years of useful life, as a minimum. iii. The BEMS is entirely on the legacy Continuum system and needs replacing. iv. The chillers are life expired and currently due for replacement by connecting via PHX to North Wing under a separate project. v. The proposed strategy for mechanical replacement and upgrades, is to undertake rationalisation of systems to allow mechanical plant, emitters and controls to be replaced system-by-system. Works should look to improve, rationalise and upgrade performance and control where possible. vi. The West Wing is Grade II listed and classed as a High-Risk Building. The Consultant M&E Engineer shall fulfil the Lead Function including BRPD and PM. They have the duty and responsibility of co-ordinating and integrating the work of the other Consultants employed on the project to maintain the Programme on all items of works. The other respective appointed Consultants will be responsible for the duties as defined in draft scope of service documents created by the Lead Consultant on an emergent basis. All consultants should be mindful of the interdependencies between disciplines and ensuring a smooth interface between co-dependent third parties. The COL Supervising Officer or Senior Principal Mechanical Engineer will take overall responsibility for design management and decision making across services.
Personalised AI Summary
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Southern Water Services Ltd
–
Published 15 hours ago
Awarded
Retrofit Credits Service
London Borough of Hammersmith and Fuham
562,500 GBP
Published 3 days ago
Guy's & St Thomas' NHS Foundation Trust
–
Published 15 days ago
Kingston upon Hull City Council
90,800,000 GBP
Published 15 days ago
Guy's & St Thomas' NHS Foundation Trust
–
Published 15 days ago
Notting Hill Housing Trust
9,000,000 GBP
Published 21 days ago
Chelmsford City Council
300,000,000 GBP
Published 23 days ago
United Kingdom Atomic Energy Authority
416,667 GBP
Published 25 days ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.