Awarded contract

Published

Newtown Riverbridge Bearing and Expansion Joint Replacement

8 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

550,469.41 GBP

Current supplier

Cambrensis Civil Engineering Ltd

Description

Notification of award of contract for the following tendered works:The work will involve replacing 14No. existing defective mechanical rocker bearings at the east abutment with new bearings of the same type and the replacement of 1No. expansion joint with a new ‘BEJ’ type joint.The replacement expansion joint shall be installed across the full width of the carriageway and both eastern and western footways. The existing kerbs shall be locally removed and reinstated to accommodate installation of the BEJ10 expansion joint.In order to ensure a smooth ride over the replacement expansion joints, a 4m length of the carriageway shall be removed and reinstated with hot rolled asphalt on both sides of the expansion joint to an appropriate level.As the joints and a limited area of surfacing is to be replaced, the carriageway road markings shall be locally renewed.In order to carry out the work safely, it is anticipated that it will be necessary to close the bridge during jacking operations and for expansion joint removal / installation so that the joint across the entire width of the carriageway can be installed and carriageway resurfacing undertaken during a series of night and weekend shifts.Replacement of the bearings shall first require jacking of the structure to enable bearing removal. All temporary works proposals including jacking, shall require suitable temporary works design to be undertaken by a person with appropriate qualifications and demonstratable experience.The 14No. exiting glacier mechanical rocker bearings at the east abutment shall be removed along with the existing levelling grout following installation of jacks.Following removal of the existing bearings, replacement bearings along with levelling grout shall be installed strictly in accordance with the chosen bearing manufacturer’s instructions.Following installation of the replacement bearings and suitable curing time for the levelling grout, jacks shall be removed in accordance with the contractor’s temporary works design and the bridge shall load the replacement bearings.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

National Highways Limited

10,342.43 GBP

Published 4 days ago

National Highways Limited

183,780.53 GBP

Published 5 days ago

City and County of Swansea

Published 5 days ago

National Highways Limited

164,285.24 GBP

Published 6 days ago

National Highways Limited

30,000 GBP

Published 8 days ago

Blackburn with Darwen Borough Council

10,810 GBP

Published 8 days ago

Kent County Council

2,000,000,000 GBP

Published 11 days ago

National Highways Limited

986,252.79 GBP

Published 13 days ago

Bridgend County Borough Council

Published 14 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.