Published

Renewable Energy Centre (REC)

34 Suppliers have already viewed this notice

Track & Win Public Sector Contracts and Tenders. Sign up for Free

Description

The scope of the REC Phase 1 is set out within the RIBA Stage 3 Design Report that has been made available through the In-Tend portal. <br /><br />The Renewable Energy Centre (REC) and associated distribution networks have been developed to provide an efficient, low carbon, flexible and adaptable heating and cooling solution for planned new buildings at the University. This project is viewed as key step in delivering a new, low-carbon network at the University of Warwick, and anticipated to eventually lead to the convergence of the Universities existing fossil fuel based network with lower carbon systems <br /><br />The new energy centre and network must: <br /><br />Be innovative, efficient and cost effective in construction and operation. <br />Be appropriate to the heating and cooling demands of the connected loads. <br />Recover energy at every opportunity. <br />Minimise the electrical network reinforcement works and costs needed to support the new energy system. <br /><br />In Phase 1 the proposed design has the capacity to generate c.4 megawatts of simultaneous heating and cooling output to two buildings - STEM Phase 1 and Social Science Connect via an underground pipe network. The design includes potential to increase output capacity through a (future) Phase 2 compound as dictated by future demands. <br /><br />We are inviting expressions of interest and engagement from potential bidders to inform options on the delivery and ongoing operation for the energy centre and associated network. Although the University has extensive experience of operating large scale centralised energy centres, (energy centres based on gas boiler and combined heat and power technology), we would like to evaluate options and interest in bidding for not only the design and build of the REC, but also the ongoing maintenance and operation. <br /><br />The University are open to options including medium to long term comprehensive, performance-based maintenance packages for a sub-set of key, named assets through to the full operation, continuous improvement and potential expansion of the heating and cooling system from source to the point of delivery into the buildings served. <br /><br />Please see the attached Stage 3 report for further information. <br /><br />In the first instance please express interest in via Intend at https://in-tendhost.co.uk/universityofwarwick and we will be in touch.

Create a Free Account on Stotles

Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

The City of Edinburgh Council

100,000,000 GBP

Published 10 days ago

The City of Edinburgh Council

100,000,000 GBP

Published 10 days ago

Orkney Islands Council

18,000,000 GBP

Published 12 days ago

Orkney Islands Council

18,000,000 GBP

Published 12 days ago

Annan Harbour Action Group

10,000,000 GBP

Published 23 days ago

Annan Harbour Action Group

10,000,000 GBP

Published 23 days ago

Gloucestershire County Council

60,000,000 GBP

Published 25 days ago

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.