Open tender

Published

Supply and Installation of addition solar PV panel generation system

2 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Value

48,000 GBP

Close date

2026-03-27

Description

The University of Salford seeks proposals to supply and install additional PV generation to one of its buildings. The Northern Engineering Robotics Innovation Centre (NERIC) was constructed in 2022 for the University of Salford, the first building on its new Innovation Campus on Frederick Road, M6 6AP. At the time it was fitted out with 15 kWp onto its higher flat roof. The roof was originally designed to accommodate more panels, but these were reduced in a value engineering exercise. 2.0 Goods and Services to be provided The University seeks to double the amount by adding another 15 kWp bringing the total to 30kWp on the existing higher, gravel ballasted flat roof, easily visible from google satellite, while still maintaining access to service plant and the PV system. We can provide hourly data for 2025 for import, generation and export and would want a model worked up using this data as a basis but on double the existing building consumption (c55,000 kWh/yr to 110,000kWh/yr) as we are expecting this to rise very shortly. Modelling should show generation, import, export, costs saved over 20-year period as a minimum, carbon saved using current grid carbon intensity, payback periods etc including inverter replacement at year 10. Work on a current electricity import price of 28p/kWh and a grid (import) carbon intensity of 177g CO2e/kWh and an export price of 5.6p/kWh Can you please provide us with a proposal and quote to include. • A cost/carbon/payback model based on the above parameters. • A rough breakdown of costs in your quote rather than a single figure. • Provide the data sheets for the proposed panels, non-penetrating fixing system and inverters. • The combined panel/fixing weight as kg/m2 as installed on the roof. • State the panel and inverter warranty. If it doesn't already have it, the inverter should have a minimum 10-year warranty. • The generation meter provided or utilising the existing one will need to be linked to our BMS system. • How and where you intend to lift the panels and fixings onto the roof. • Provide a separate option for battery storage, it's price and impact on export. • You would be expected to carry out all the liaison for approvals with the DNO. • Comply with the University's standard T&Cs for this type of electrical work. • Two references with contact details for similar systems you have installed.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

SWAYTHLING HOUSING SOCIETY LIMITED

33,450,000 GBP

Published 13 days ago

West Mercia Energy

80,000,000 GBP

Published 20 days ago

Lee Valley Regional Park Authority

450,000 GBP

Published 20 days ago

City of Bradford Metropolitan District Council

440,000 GBP

Published a month ago

South Gloucestershire Council

338,000 GBP

Published a month ago

Corserv Ltd

500,000 GBP

Published 2 months ago

Portsmouth City Council

8,900,000 GBP

Published 2 months ago

North York Moors National Park Authority

118,000 GBP

Published 3 months ago

West Suffolk NHS Foundation Trust

280 GBP

Published 3 months ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.