Awarded contract
Published
Supply and Maintenance of Rolling Stock
74 Suppliers have already viewed this notice
Track & Win Public Sector Contracts and Tenders. Sign up for Free
Description
LNER was seeking to procure a minimum fleet of ten (10) InterCity trains based around specific technical and operating characteristics. The trains were to be fully rated for operation on 25kV Overhead Line Equipment (OLE) and with self-power capability for operation away from the OLE. On Board Energy Storage (OBES) for traction was to be specified as a mandatory requirement to reduce, and wherever practicable eliminate, diesel usage where it would otherwise be necessary. LNER anticipated that some degree of diesel traction may be required to supplement the OBES to meet all the self-power requirements. The trains will provide LNER with additional capacity to accommodate future growth and have performance characteristics that enable the fleet to be timetabled effectively amongst modern InterCity trains, as well as increasing the flexibility of LNER's fleet and providing the ability to provide uninterrupted services during engineering works. Lot 1: LNER carried out a procurement process with potential manufacturers for the design, manufacture, testing and supply (and associated maintenance activities) of a base order of ten (10) InterCity trains, owner owned spares, special tools, simulator hardware and technical information, mock-ups and depot works for the use on the East Coast franchise. There was also an option to procure up to an additional five (5) trains. LNER chose to run the procurement under the negotiated procedure with a prior call for competition under regulation 47 of the Utilities Contracts Regulations 2016 (UCR16). LNER is registered with the Railway Industry Supplier Qualification Scheme (RISQS), enabling it to use this as a qualification system for the procurement. A Prior Information Notice was also issued to make suppliers aware of the procurement and set out the process being used (including the proposed registration requirements for the RISQS system and additional selection questions). The successful manufacturer was chosen on the basis of the most economically advantageous bid based on the award criteria set out in the procurement documents. A separate procurement process under the UCR16 was carried out by LNER for the financing of the new trains.
Personalised AI Summary
Unlock decision maker contacts.
Create a Free Account on Stotles
Stotles is your single source for government tenders, contracts, frameworks and much more. Sign up for free.
Explore similar pre-tenders, open or awarded contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
Transport for London
4,620,437.34 GBP
Published a month ago
Transport for London
921,156 GBP
Published 4 months ago
The Chiltern Railway Company Limited
300,000,000
Published a year ago
The Chiltern Railway Company Limited
400,000,000
Published a year ago
The Chiltern Railway Company Limited
400,000,000
Published a year ago
The Chiltern Railway Company Limited
200,000,000
Published a year ago
Explore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
CPV Codes
Sign up to the Stotles Tender Tracker for free
Find even more contracts with advanced search capability and AI powered relevance scoring.