Construction and commission of modular rig

4 suppliers have saved this notice.

Looks like a fit? Save this tender and qualify it in Stotles

Close date

2026-02-20

Description

UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network 1. Project Overview UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. ________________________________________ 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network Installation Verification • Completion of installation checks against drawings and specifications • QA/QC inspections and documentation • Identification and resolution of defects or non-conformances • As-built documentation and redlining Inactive Commissioning • Mechanical completion checks • Pressure/leak testing (where applicable) • Functional checks (non-energised / non-process) • Safety and compliance verification • Handover documentation and commissioning packs ________________________________________ 3. Contractor Requirements Interested parties should demonstrate: • Experience assembling modular or multi-storey industrial/process rigs or plant • Experience working with multi-disciplinary service interfaces (gas, fluids, extraction, electrical) • Commissioning and mechanical completion experience • Strong health, safety, and quality management systems to comply with CDM regulations • Ability to work within an operational facility environment • Relevant certifications and competencies ________________________________________ 4. Deliverables The appointed contractor will be expected to provide: • Method statements and risk assessments • Installation and commissioning plans • Inspection and test records • Mechanical completion dossiers • As-built documentation • Handover pack ________________________________________ 5. Programme (Indicative) • Site readiness: June 2026 • Assembly period: 3 months • Handover to active commissioning: September 2026

Unlock decision maker contacts.

Never miss a tender again

Get alerts, AI summaries and tools to qualify faster

Explore similar pre-tenders, open or awarded contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Swansea University

5,000,000 GBP

Published a day ago

Peterborough City Council

Published a day ago

London Borough of Bromley

450,000 GBP

Published 5 days ago

London Borough of Brent

2,800,000 GBP

Published 5 days ago

Yorkshire Water Services Ltd

4,000,000 GBP

Published 6 days ago

Stowmarket Town Council

20,000 GBP

Published 6 days ago

Southampton City Council

300,000 GBP

Published 6 days ago

NHS Supply Chain

1,000,000,000 GBP

Published 6 days ago

The Crescent Academy

85,000,000 GBP

Published 7 days ago

Explore top buyers for public sector contracts

Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.

Explore over 15,000 buyers

Sign up to the Stotles Tender Tracker for free

Find even more contracts with advanced search capability and AI powered relevance scoring.