Pumps
Published
Buyer
Supplier(s)
Description
The multi-supplier framework will be established on a national basis and sub-divided into two separate lots: Lot 1: The Supply and Delivery of pumps, parts and accessories to Irish Water. Lot 1 is further divided down into the following sub-Lots: (a) wet well submersible pump(s), (b) dry well submersible pumps(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) Multistage and Booster. Lot 1: tenderers shall be required to provide rates for pump accessories and pipework as part of their tender. successful tenderers for lot 1 shall fulfil the role of PSDP. Lot 2: The Supply and Installation of Pumps, Parts and Ancillary items for Irish Water. Lot 2 is further broken down into the following pump categories: (a) wet well submersible pump(s), (b) dry well submersible pump(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) multistage and booster. Lot 1: The Supply and Delivery of pumps, parts and accessories to Irish Water. Lot 1 is further divided down into the following sub-lots: (a) wet well submersible pump(s), (b) dry well submersible pumps(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) Positive Displacement/Dosing pump(s), (f) End Suction pump(s), (g) multistage and booster. Lot 1: Tenderers shall be required to provide rates for pump accessories and pipework as part of their tender. Successful tenderers for lot 1 shall fulfil the role of PSDP. In relation to all lots; The products/works are intended in the most part to be used for the repair, upkeep, maintenance and expansion of the national water infrastructure in connection with: • the abstraction, treatment and distribution of drinking water; • the collection and treatment of waste water and sludge disposal; • conservation of water supplies through maintaining and upgrading the infrastructure including investment in mains rehabilitation; • improve energy efficiency. Ancillary items shall include but shall not be limited to, support/positioning elements such as guide rails, duck feet, stools, adaptor plates, non- return valves and DI Piping. Tenderers shall ensure that pumps offered to Irish Water have multiple supply routes within Ireland, i.e. sole agents and discontinued products shall not be accepted either. The successful tenderers shall be required to provide technical support to the contracting entity where required including condition surveys and scheme designs. Interactions between the lots: The lot 2 tenderers only include the price of installation in their pricing schedules — when buying from lot 2, Irish Water will specify the items required by name and the successful lot contractors will buy these items from the lot 1 suppliers under the terms of the equipment supply agreements. The lot 1 suppliers rates will be provided to the lot 2 contractors at call-off stage and will be included in the price of the lot 2 work order. The lot 1 suppliers will be required to extend credit facilities to the lot 2 contractors on a 45 day end of month basis. The (confidential) percentage discount, as indicated by the lot 1 suppliers in the pricing schedule, shall be rebated directly to the contracting entity on a quarterly basis at the applicable rate. A balance statement shall be provided by the lot 1 supplier within 7 days of the end of a quarter, to itemise the quantum of goods supplied and the discounted sum due to the contracting entity. The actual sum due, shall be paid to the contracting entity 91 days after a quarters end (to facilitate payment collection by the supplier, from the lot 2 contractors). Lot 2: The Supply and Installation of Pumps, Parts and Ancillary items for Irish Water. As per lot 1, lot 2 is further broken down into the following pump categories: (a) wet well submersible pump(s), (b) dry well submersible pump(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) multistage and booster. There shall be no sub-lots provided for under lot 2. The responsibilities of the successful tenderers on lot 2 will include the provision of all works and services associated with the following: • upgrading, replacing or providing pumping equipment; • upgrading, replacing or providing accessories associated with pumping equipment; • testing, commissioning and certification of the works; • measurement and verification of energy efficiency improvements; • all ancillary civil engineering works associated with the primary works. The successful tenderers for lot 2 shall fulfil the role of PSDP, Designer, PSCS and contractor under the safety, health and welfare at work (Construction) Regulations 2013 for all works to be provided under the framework agreement. In relation to all lots: The products/works are intended in the most part to be used for the repair, upkeep, maintenance and expansion of the national water infrastructure in connection with: • the abstraction, treatment and distribution of drinking water; • the collection and treatment of waste water and sludge disposal; • conservation of water supplies through maintaining and upgrading the infrastructure including investment in mains rehabilitation; • improve energy efficiency. Ancillary items shall include but shall not be limited to, support/positioning elements such as guide rails, duck feet, stools, adaptor plates, non- return valves and DI Piping. Tenderers shall ensure that pumps offered to Irish Water have multiple supply routes within Ireland, i.e. sole agents and discontinued products shall not be accepted either. The successful Tenderers shall be required to provide technical support to the Contracting Entity where required including condition surveys and scheme designs. Interactions between the lots: The lot 2 tenderers only include the price of installation in their pricing schedules — when buying from lot 2, Irish Water will specify the items required by name and the successful lot contractors will buy these items from the lot 1 suppliers under the terms of the equipment supply agreements. The lot 1 suppliers rates will be provided to the lot 2 contractors at call-off stage and will be included in the price of the lot 2 work order. The lot 1 suppliers will be required to extend credit facilities to the lot 2 contractors on a 45 day end of month basis. The (confidential) percentage discount, as indicated by the lot 1 suppliers in the pricing schedule, shall be rebated directly to the contracting entity on a quarterly basis at the applicable rate. A balance statement shall be provided by the lot 1 supplier within 7 days of the end of a quarter, to itemise the quantum of goods supplied and the discounted sum due to the contracting entity. The actual sum due, shall be paid to the contracting entity 91 days after a quarters end (to facilitate payment collection by the supplier, from the lot 2 contractors).
Timeline
Award date
4 years ago
Publish date
4 years ago
Buyer information
Irish Water
- Contact:
- Tender Admin
- Email:
- tenders@ervia.ie
Explore contracts and tenders relating to Irish Water
Go to buyer profileNotice topics
Source
Ted (OJEU)To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Awarded
Project 289 - St. Ailbe's - Additional Permanent Accommodation - Building Services M&E Consultant
Tipperary Education and Training BoardPublished 3 months ago
- Awarded
Project 339 Scoil Ruain_Building Services (Mechanical & Electrical) - One pipe heating distribution system
Tipperary Education and Training BoardPublished 3 months ago
- Awarded
Tender for Design Team Services for the Refurbishment of the existing Sports Hall Building, Bishopstown Campus, MTU Cork.
Munster Technological UniversityPublished 3 months ago
- Awarded
Construction of new Coast Guard Station at Westport Harbour, Westport, Co. Mayo
Office of Public Works (OPW)Published 3 months ago
- Awarded
Consultancy Services for the proposed Housing Development (10nr. units) at No. 43 & No. 44 Brews Hill, Navan, Co. Meath
Meath County CouncilPublished 4 months ago
- Awarded
The construction of 12 no. new residential units at No. 43 & 44 Brews Hill, Navan, Co. Meath.
Meath County CouncilPublished 4 months ago
- Awarded
Single Party Framework agreement for the provision of Mechanical and Electrical Engineering Services for the Dublin City Council Housing Development at Emmet Road, Inchicore, Dublin 8
Dublin City CouncilPublished 4 months ago
- Awarded
Multi-Party Framework for Mechanical Works Projects in the range of €0 - €25k
University of GalwayPublished 4 months ago
- Awarded
Old Library Redevelopment Project - High Pressure Water Mist (HPWM) Fire Suppression System for Trinity College Dublin, the University of Dublin
Trinity College Dublin, the University of Dublin329,952 EURPublished 4 months ago
Explore other contracts published by Irish Water
Explore more open tenders, recent contract awards and upcoming contract expiries published by Irish Water.
- Awarded
22/006 - Regional Biosolids Storage Facility – Design Build Contract - PQQ
Irish Water27,145,513.41 EURPublished 4 months ago
- Awarded
21/044 - Single Supplier Framework for the provision of IT Support, Maintenance and Development Services to Irish Water
Irish Water358,536,585.37 EURPublished 4 months ago
- Awarded
22/006 - Regional Biosolids Storage Facility – Design Build Contract - PQQ
Irish WaterPublished 4 months ago
- Awarded
21/044 - Single Supplier Framework for the provision of IT Support, Maintenance and Development Services to Irish Water
Irish WaterPublished 5 months ago
- Awarded
21/114-Ringsend WwTP - Instrumentation Maintenance and Servicing Package - PQQ
Irish WaterPublished 6 months ago
- Awarded
22/012 - Multi Supplier Framework for the Provision of Capital Works PMO Services
Irish WaterPublished 7 months ago
- Awarded
22/012 - Multi Supplier Framework for the Provision of Capital Works PMO Services
Irish WaterPublished 7 months ago
- Awarded
21/107 - Multi Supplier Framework Agreement for Telemetry Outstations and Water Network Data Loggers for Irish Water
Irish WaterPublished 8 months ago
Explore more suppliers to Irish Water
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
- Barnsley Metropolitan Borough Council
- University of Bristol
- Advance Northumberland Limited
- East Kent Hospitals University
- Association Of North East Councils
- Tamworth Borough Council
- Tourism Ireland Ltd
- North Kesteven School
- Sir Thomas Rich's School
- Moulton Parish Council
- Hawes Side Academy
- William Willett Learning Trust
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.