Stotles logo
Awarded

DS3 System Services - Volume Uncapped – Gate 5

Published

Description

Gate 5 covers all 12 services as outlined in this Qualification System Briefing Document. There is: - A separate DS3 System Services Agreement for services in Ireland, which is to be entered into with EirGrid; and - A separate DS3 System Services Agreement for services in Northern Ireland, which is to be entered into with SONI The services are split into a number of Lots for each of the TSOs as follows: - Lots 1IE – 12IE relate to the System Services required by EirGrid. - Lots 1NI – 12NI relate to the System Services required by SONI. It is intended that the start date of each of the Contracts awarded under Gate 5 is 1st October 2021. It is intended that the term of each Contract will last until 30th April 2023, but with an option for each TSO to extend the term of its Contract in respect of any or all of its applicable Lots in certain defined cases for two additional time periods of up to eighteen (18) months each, at the discretion of the Contracting Entity. This option might apply where, for instance, there is a delay in completing the procurement for any subsequent phases envisaged under the DS3 Programme. Lot 215127: POR L1IE - Primary Operating Reserve Primary Operating reserve or ‘POR’ has the meaning given to it in the Grid code Lot 215130: SOR L2IE - Secondary Operating Reserve Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code Lot 215347: TOR1 L3IE - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code Lot 215348: TOR2 L4IE - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code Lot 215349: RRD L5IE - Replacement Reserve (De-Synchronised) RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit Lot 215351: RRS L6IE - Replacement Reserve (Synchronised) RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module Lot 215352: SSRP L7IE - Steady State Reactive Power Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging) Lot 215354: SIR L8IE - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF) Lot 215355: RM1 L9IE - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period Lot 215356: RM3 L10IE - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period Lot 215359: RM8 L11IE - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period Lot 215360: FFR L12IE - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event Lot 215361: POR L1NI - Primary Operating Reserve Primary Operating Reserve and Primary Operating reserve or ‘POR’ has the meaning given to it in the grid code Lot 215362: SOR L2NI - Secondary Operating Reserve Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code Lot 215363: TOR1 L3NI - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code Lot 215364: TOR2 L4NI - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code Lot 215365: RRD L5NI - Replacement Reserve (De-Synchronised) RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit Lot 215366: RRS L6NI - Replacement Reserve (Synchronised) RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module Lot 215367: SSRP L7NI - Steady State Reactive Power Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging) Lot 215369: SIR L8NI - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF) Lot 215370: RM1 L9NI - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period Lot 215371: RM3 L10NI - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period Lot 215372: RM8 L11NI - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period Lot 215373: FFR L12NI - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event

Timeline

Publish date

3 years ago

Award date

3 years ago

Buyer information

EirGrid plc

Contact:
Anna Pocock
Email:
tenders@eirgrid.com

Explore contracts and tenders relating to EirGrid plc

Go to buyer profile
To save this opportunity, sign up to Stotles for free.
Save in app
  • Looking glass on top of a file iconTender tracking

    Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.

  • ID card iconProactive prospecting

    Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.

  • Open folder icon360° account briefings

    Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.

  • Teamwork iconCollaboration tools

    Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.

Stop chasing tenders, start getting ahead.

Create your free feed

Explore similar tenders and contracts

Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.

Explore other contracts published by EirGrid plc

Explore more open tenders, recent contract awards and upcoming contract expiries published by EirGrid plc.

Explore more suppliers to EirGrid plc

Sign up